Challenges At Stake

Very high speed services for all.

In 2013, French authorities launched an ambitious program called “Le Plan France Très Haut Débit” (national super-fast broadband plan) that aims to provide the whole population with very high speed services.

Deploying next-generation networks based on very high speed is major step for the French economy and industry. Indeed, they leverage business competitiveness, encourage attractiveness of local territories and trigger innovative service developments.

This economy generates the involvement of many market players, whose core challenges are to secure the followings factors of any deployment program:

  • Final quality of the executed works (a critical factor when it comes to outlet commercialization)
  • Deadline compliance &Commitments fulfilment
  • Technical-economic optimization of the overall investments
R&C’s Solutions

R&C implements all kind of optical fiber network.

R&C shapes, follows and implements all your optical fiber (FTTx) deployment projects and programs on a nationwide scale.

Thanks to our expertise and know-how, R&C is in position to play a role throughout the whole deployment process of FTTx networks (FTTH, FTTA, FTTB):

  • Engineering Design
  • Negotiation of network implementation locations
  • Infrastructure Construction and Deployment
  • Infrastructure Measurement, Qualification and Measurement work
  • Final connections
  • Operation and Maintenance, After-sales service

 

Offering turnkey solutions, R&C plays an active role at each stage of a fixed network rollout (especially regarding the transportation and distribution parts):

  • Infrastructure creation: Civil Engineering to dig trenches, vertically up to subscribers and horizontally (overhead and underground) , mutualization of existing third-party infrastructures
  • Network rollout: sourcing, negotiating and operating telecom sites, optical fiber/coaxial and copper cable laying, installation of final connections, fiber networks continuity testing, executed work qualification, reflectometric measurements, network activation.

 

To secure quality and deadline compliance, R&C implements tight and stringent project management methods, based on a single Project Manager that coordinates all the actions and actors that are necessary for the project completion:

  • As the privileged interlocutor of the client over the whole lifespan of the program, the Project Manager monitor a whole “ecosystem” of dedicated actors:
    • Project teams (operation sequencing, planning, executed work follow-up and reporting)
    • Estate negotiation teams
    • Production teams (led by a Technical Supervisor)
    • Audit teams for network validation tests and qualification
    • QSE teams accountable for safety and quality

R&C gathers a great variety of assets to answer your needs: Expertise, Management, Production capacities, Reactivity, Nationwide coverage.

  • 2018 Creation of the Fixed Network Deployment Unit
  • 20 000 Optical fiber outlets deployed per year
  • +  6 French Departments covered by our interventions
Discover

Our references

More references
  • Fixed Network Deployment

    Fixed Network Deployment (in the Normandy region)

    Winning a 2-year Contrat for FTTH network deployment in the Normandy, proving our expertise of infrastructures and technical methodology. Implementation of a dedicated project management and work scheduling unit, having brought together partners to intervene in the entire area concerned.

    Technological solutions used
    • QGIS

      QGIS Engineering data modelling tool

    • KIZEO

      Real-time capture of information collected in the field

    • QFIELD

      Notepad tool dedicated to addresses compilation in a Shape format

    • logo R&C
      State-of-the-art technical equipment

      For the work on the field: Active V-groove fusion splicer, OTDR, aerial bucket truck, etc

  • Fixed Network Deployment

    Fixed Network Deployment (in buildings)

    Monitoring fixed network deployment in the Paris region. Our management of operations proved a high responsiveness and flexibility to support increased production load throughout the project.

    Technological solutions used
    • QGIS

      QGIS Engineering data modelling tool

    • KIZEO

      Real-time capture of information collected in the field

    • QFIELD

      Notepad tool dedicated to addresses compilation in a Shape format

    • logo R&C
      State-of-the-art technical equipment

      For the work on the field: Active V-groove fusion splicer, OTDR, aerial bucket truck, etc

  • Fixed Network Deployment

    Fixed Network Deployment (for a Public Initiative Network project)

    Monitoring fixed network deployment in the Pays-de-Loire region, covering both the transportation part and the distribution downstream area (ZAPM). Using end-to-end deployment technological solutions. Implementation of a dedicated project management and work scheduling unit, having brought together partners to intervene in the entire area concerned.

    Technological solutions used
    • QGIS

      QGIS Engineering data modelling tool

    • KIZEO

      Real-time capture of information collected in the field

    • QFIELD

      Notepad tool dedicated to addresses compilation in a Shape format

    • logo R&C
      State-of-the-art technical equipment

      For the work on the field: Active V-groove fusion splicer, OTDR, aerial bucket truck, etc

This website uses cookies for user experience enhancing, content adaptation and web traffic analysis. When clicking on the button “I accept”, you give you consent for the installation of all the cookies. You can also opt to “personalize the cookie policy” according to your own preferences and choices.